The final segment of every charging interval drops out of the site profile.
Case contract
plan holds [start, end, kw] charging intervals ([start, end), zero-length ignored). Build the site profile as change points [[t, total_kw]] over the interval breakpoints, merging equal consecutive levels, and close with [last breakpoint, 0] unless the profile already ends at 0. Also return the start points of segments whose total exceeds site_max. Return [profile, overloads].
Why this case matters
Depot, workplace and public EV chargers schedule sessions against prices, circuit limits and departure deadlines; a wrong decision silently strands a driver or overloads a feeder.
One recorded failure
Sample boundary fixtureThis sample comes from the broken implementation of a controlled reproducer.
| Boundary fixture | Actual | Expected | Outcome |
|---|---|---|---|
| boundary: zero-length interval before plan | [[[10, 0]], []] | [[[10, 11], [20, 0]], []] | Failed |
MEMBER ARCHIVE
The complete case is available to members.
This record includes three runnable implementations, regression fixtures, execution results, and source hashes.
Member access is invitation-based. Sign in with your invited account to inspect the sources.
Sign in to the archive ↗