FA-71800 / Seismic magnitude estimation / Member archive
S-P nomogram local magnitude: distance proxy factor · case 05
Magnitudes are 2.7 units low.
Case contract
Zero-to-peak amplitude in mm and P and S arrival times in s. dt = tS - tP must be positive and amplitude positive, else None. ML = log10 A + 3 log10(8 dt) - 2.92, rounded 0.01.
Why this case matters
Field seismologists read ML from the S-P interval and amplitude nomogram.
One recorded failure
Sample boundary fixtureThis sample comes from the broken implementation of a controlled reproducer.
| Boundary fixture | Actual | Expected | Outcome |
|---|---|---|---|
| A 0.001 mm P 10.0 S 12.5 | -4.73 | -2.02 | Failed |
MEMBER ARCHIVE
The complete case is available to members.
This record includes three runnable implementations, regression fixtures, execution results, and source hashes.
Member access is invitation-based. Sign in with your invited account to inspect the sources.
Sign in to the archive ↗