FAILURE MAP
← Case archive

FA-68967 / Tide and marine navigation tables / Member archive

Bridge air draft clearance: Rising tide increases the bridge clearance · case 02

Clearance appears to grow as the tide rises, approving transits at high water.

Member previewVariant 2 · 3 implementations · 7 checks per implementation

Case contract

Input [c, mhws, tide, air, safety]: charted vertical clearance c is measured above MHWS; mhws and tide are heights above chart datum; air is the vessel air draft. Available clearance = c+(mhws-tide) (it shrinks when the tide exceeds MHWS). Return [round(avail,2), round(avail-air,2), avail-air>=safety].

Why this case matters

Tide tables and passage plans turn published predictions into go/no-go decisions about depth, clearance and timing.

One recorded failure

Sample boundary fixture

This sample comes from the broken implementation of a controlled reproducer.

Boundary fixtureActualExpectedOutcome
bridge air draft clearance [18.0, 4.6, 5.3, 17.0, 1.0][18.7, 1.7, true][17.3, 0.3, false]Failed

MEMBER ARCHIVE

The complete case is available to members.

This record includes three runnable implementations, regression fixtures, execution results, and source hashes.

Member access is invitation-based. Sign in with your invited account to inspect the sources.

Sign in to the archive ↗