FA-67208 / Railway interlocking logic / Member archive
Call-on permissive move authorisation: stationary requirement · case 03
A call-on is given to a train still rolling towards the signal.
Case contract
Without a route the answer is none. With the section ahead clear the main aspect is given. Into an occupied section a call-on is given only if the train has stood at the signal for at least 120 s and is stationary (0 km/h), the gap to the standing train is at least 20 m and that train is not moving; otherwise none.
Why this case matters
Interlocking logic decides whether trains may be given authority; a wrong decision at this point either grants unsafe movements or strands traffic.
One recorded failure
Sample boundary fixtureThis sample comes from the broken implementation of a controlled reproducer.
| Boundary fixture | Actual | Expected | Outcome |
|---|---|---|---|
| regression: creeping at walking pace | "call-on" | "none" | Failed |
MEMBER ARCHIVE
The complete case is available to members.
This record includes three runnable implementations, regression fixtures, execution results, and source hashes.
Member access is invitation-based. Sign in with your invited account to inspect the sources.
Sign in to the archive ↗