FA-66889 / Railway interlocking logic / Member archive
Four-aspect signal chain evaluation: preliminary caution step · case 04
A signal two blocks behind a red shows green instead of double yellow.
Case contract
Signals 0..n-1 each protect one block; occupied[i] is the block after signal i. Evaluate from the far end: a signal shows R if its block is occupied, else Y if the next signal is R, R if the next signal is DARK, YY if the next is Y, otherwise G. Beyond the last signal the next aspect is G on an open line and R at a buffer stop. A diverging signal is capped at Y. A signal whose red lamp has failed shows DARK instead of R.
Why this case matters
Interlocking logic decides whether trains may be given authority; a wrong decision at this point either grants unsafe movements or strands traffic.
One recorded failure
Sample boundary fixtureThis sample comes from the broken implementation of a controlled reproducer.
| Boundary fixture | Actual | Expected | Outcome |
|---|---|---|---|
| regression: buffer stop at the end | ["G", "G", "Y"] | ["G", "YY", "Y"] | Failed |
MEMBER ARCHIVE
The complete case is available to members.
This record includes three runnable implementations, regression fixtures, execution results, and source hashes.
Member access is invitation-based. Sign in with your invited account to inspect the sources.
Sign in to the archive ↗